Thursday, January 31, 2008

many things in the works

well. the foundation is poured. the waterproofing is ordered and going on next week. the foundation survey is ordered. as soon as that stuff happens the foundation needs to get inspected, then the electric can get ordered. the footwork is under way to get a good price on moling under the street for electric. the plumbing pipe is supposed to be dug-in next week. and the joists and framing is about to begin (as soon as i get the as-built approved). i need to find out from ryan if he needs me to get the corrugated flooring that goes over the joists and takes the cement before backfilling takes place. still haven't ordered the kit (gulp!). here's what it looks like right now.



here's a close-up of the ICF's (insulated concrete forms). they look just like styrofoam packing material. because basically that's what it is.

No comments: